• 'Dr. Guido Zimmermann - Geschäftsleitung'
Dr. Guido Zimmermann
Geschäftsführer
Mainsite Technologies is your competent partner for the complete special plant engineering and construction as well as for maintenance and service of your industrial plant.

Tel: +49 (0) 60 22 / 81 3366

kontakt@maintech.pro
Genius
development & conception
Mehr erfahren
Build
production & manufacturing
Mehr erfahren
Install
assembly & commissioning
Mehr erfahren
Care
maintenance & technical service
Mehr erfahren
  • Industrie Verfahrenstechnik und Industrie Anlagen
Industrie
Process engineering & plants
Details
  • Wasser - Aufbereitung und Management
Water
treatment & management
Details
  • Energie - Erzeugung und Innovationen
Energy
production & innovation
Details
  • Fasertechnologie - Spinnanalagen und Membrananlagen
Fibers
spinning systems & membrane
Details

Equipment and plants for solvent recovery and cleaning of exhaust air used by the process industry

Read more …

The solution to germs and microbes in the water meter: the fully automatic rinsing unit.

Read more …

In its anniversary issue, the trade magazine F&S-Filtrieren und Separieren (Filtration & Separation) published a detailed article on the technique and its technologies presented during the meeting.

Read more …

From 26 to 27 April 2017 we presented our own booth for the first time at the 4th South- and East-Bavarian Water Congress in Landshut.

Read more …

variable R&D spinning systems

variable-R-D-spinning-systems

Modular pilot facilities

After the first feasibility studies in research with simple spinning testers, for the next steps in fiber development a spinning machine for experimental purposes is needed. Here rheological data of many different systems of solvents and polymers, corrosive properties of the components and all other key parameters such as pressure and temperature are determined. These, then serve as a basis for the plant layout and design. According to the chosen number of spinning points the "scale-up" character of an experimental plant has to be considered, insofar as possible.  Specifically for the right nozzle geometry, heat transition-, flow- and pressure loss calculations as well as respective simulations have to be carried out.

Sufficient material production for a correct sampling is a further criterion in determining the plant capacity.

Meticulously selected, multiple measuring points are well tuned in the automation concept. They thus form a solid base for necessary parameter collection.

The pilot plants installed by us are constructed in a modular structure. So they provide a maximum flexibility in testing various equipment components and in collecting the complete mechanical process parameters

 

  • Wet spinning line with spinning part, washing system, dryer, trio, winding system
    Wet spinning line with spinning part, washing system, dryer, trio, winding system
  • Industrie Verfahrenstechnik und Industrie Anlagen
Industrie
Process engineering & plants
Details
  • Wasser - Aufbereitung und Management
Water
treatment & management
Details
  • Energie - Erzeugung und Innovationen
Energy
production & innovation
Details
  • Fasertechnologie - Spinnanalagen und Membrananlagen
Fibers
spinning systems & membrane
Details